Boiler Erection & Commissioning
Complete erection of CFBC, AFBC and waste heat recovery boilers — from foundation setting to hydro test, light-up and load stabilisation.
Our approach
Our core discipline and the work we are best known for. We have erected and commissioned CFBC and WHRS/WHRB boilers from 5 MW to 45 MW, and pressure parts up to 455 TPH, for cement, chemical and power clients across India — most of it as the erection partner to Thyssenkrupp Industries India.
Scope of work
- Drum lifting, positioning and levelling
- Water wall, superheater, economiser and air pre-heater assembly
- Pressure part alignment and expansion allowance
- ESP, ducting and refractory coordination
- Hydro testing, steam blowing and safety valve floating
- Light-up, load raising and performance stabilisation
Related services
WHRS / WHRB Systems
Waste heat recovery boilers for cement plants — AQC and PH boilers, complete site fabrication through commissioning.
EPC & Turnkey Projects
Detailed engineering, procurement, fabrication, installation, pre-commissioning, hook-up and commissioning on a turnkey basis.
Industrial Piping — IBR & Non-IBR
Piping in CS, CS-NACE, SS, SS-NACE, duplex and CuNi — fabricated, erected, tested and certified.