How a project actually gets executed

Four phases, each with defined deliverables and hold points. This is the operating model behind every package we take on, from a single erection scope to full turnkey mechanical work.

Engineering → Procurement → Construction → Commissioning

One continuous flow, one owner

01

Enquiry & Method Engineering

We study the drawings, plant layout and access constraints, then produce the erection scheme, rigging study and lift plan before quoting. You receive a method, not just a rate.

  • Drawing and specification review
  • Erection sequence and rigging studies
  • Manpower histogram and equipment list
  • Priced offer against a defined scope
02

Mobilisation & Site Setup

Crews arrive trade-tested and compliant. Gate passes, statutory paperwork, tools and consumables are arranged in advance so the first shift is productive rather than administrative.

  • Welder qualification testing completed pre-deployment
  • PF/ESIC, gate pass and statutory compliance
  • Tools, tackles and third-party load certificates
  • Site induction and HSE orientation
03

Execution & Quality Control

Work proceeds against the approved sequence with inspection at defined hold points. Nothing advances past a hold point until it is signed off — which is why rework stays low.

  • Daily progress against the L3 schedule
  • NDT, dimensional and alignment inspection
  • Approved WPS/PQR for all critical welding
  • Documented PWHT and heat treatment charts
04

Testing, Commissioning & Handover

Hydro testing, flushing, trial runs and performance demonstration — followed by a complete records file handed over on the day of completion, not weeks after.

  • Hydro and pneumatic pressure testing
  • No-load and on-load trial runs
  • Punch list closure and clearance
  • As-built drawings and full QA dossier

Owned plant & machinery

We mobilise on our own equipment

Nothing below is hired in. When a schedule needs 40 welders on two fronts by Monday, availability is not a phone call to a rental yard.

Welding & Cutting

Welding machines 400 A
105
Welding machines 300 A
60
IBR welding sets
37
Mother & portable ovens
116
Argon torches
150
Welding cable
12,300 m

Lifting & Rigging

Chain blocks (1–10 T)
542
Wire rope pulleys
199
Hydraulic jacks
68
Winch machines (5 & 10 T)
17
Faranas (15–17 MT)
10
Webbing sling belts
623

Safety Equipment

Safety belt harnesses
780
Fall arrestor blocks
546
Scaffolding pipes
4,600
Scaffolding clamps
4,800
MS jali sheets
950
Air blowers
25

Measurement & QC

Theodolite / total stations
8
Dial gauges & micrometers
36
Welding gauges
62
Feeler gauges
49
Dumpy levels
10
Right angles
231

Tube & Pipe Shop

Tube bending machines
4
Tube cutting machines
2
Tube expanding machines
2
Hydro pumps
6
Cutting hose pipe
18,000 m
Grinding machines
146

Power & Site Services

Electrical panels 400 A
16
Distribution panels 63 A
82
Air compressors
20
Power cable
23,000 m
Staff vehicles & trailers
12
Computers & laptops
83

Quality controls

The controls behind every hold point

IBR Class-I Approval

Approved under Regulation 392 of IBR-1950 as Class-I boiler repairer/erector and steam/feed pipe line fabricator for working pressure above 40 up to 125 kg/cm².

Qualified Welding Procedures

All critical welding executed to approved WPS backed by PQR, with welder qualification testing carried out before deployment.

Non-Destructive Testing

Radiography, ultrasonic, magnetic particle and dye penetrant testing applied per the approved quality assurance plan at defined hold points.

Heat Treatment Control

Pre-heat and post-weld heat treatment performed and recorded with calibrated equipment and traceable temperature charts.

Dimensional & Alignment Survey

Laser and dial-gauge instrumentation for plumbness, level, elevation and rotating-equipment alignment — measured and recorded, never estimated.

Third-Party Inspection

Coordination with client, consultant and statutory inspection agencies, with a records file maintained progressively rather than assembled at the end.

Risk we design out

The failure modes we plan against

Every item below is a recurring cost centre in heavy engineering. Our method addresses each one before mobilisation rather than reacting to it on site.

Shutdown windows overrun

Every additional day of a cement or power plant outage burns lakhs in lost production and idle overheads.

How we handle it

We plan the shutdown before mobilising — hour-by-hour sequence, manpower histogram, pre-staged spares and tools, and round-the-clock shift execution with daily progress reporting.

Plant handed back inside the agreed window.

Too many contractors, no single owner

Structural blames mechanical, mechanical blames piping, and the schedule slips while responsibility is debated.

How we handle it

We take integrated scope across structural, mechanical, piping, insulation and commissioning under one contract — as we did on the 21.5 MW full EPC package at ACC Wadi.

One accountable party, no interface gaps.

Rework on pressure parts and critical welds

Failed radiography on a high-pressure joint means cutting, re-welding, re-testing — and a hydro test that slips by days.

How we handle it

Only qualification-tested welders on pressure boundaries, work to approved WPS/PQR, documented PWHT and NDT at defined hold points rather than after the fact. We hold IBR Class-I approval and 37 dedicated IBR welding sets.

First-time-right weld acceptance.

Misalignment surfacing after commissioning

Equipment that vibrates from day one shortens bearing life and forces unplanned outages for years.

How we handle it

Laser and dial-gauge alignment, verified foundation and grouting, cold and hot alignment checks, and no-load trials before load is applied.

Equipment that runs within OEM tolerance.

Manpower that cannot clear the trade test

Crews arrive, fail qualification at the gate, and the schedule loses a week before a single joint is welded.

How we handle it

Welders are qualification-tested before deployment, riggers are safety-inducted, and all statutory, PF/ESIC and gate-pass compliance is handled by us in advance.

Crews productive from day one.

Documentation that fails the audit

Physically complete work cannot be billed or handed over because the records file is incomplete.

How we handle it

Inspection runs to an approved QAP from the start — NDT reports, heat treatment charts, test certificates and as-built drawings compiled progressively.

Handover dossier ready on completion day.

Health, safety & environment

Height, load and hot work are unforgiving

Safety on an erection front is a system, not a slogan. These controls are applied on every job regardless of size or schedule pressure.

Discuss Your Scope
  • Work permit system compliance on every live-plant front
  • Daily toolbox talks before each shift
  • Trained and certified riggers for all critical lifts
  • Full-body harness and enforced PPE at height
  • Third-party tested lifting tools and tackles
  • Confined space and hot work controls

Safety First, Always

Height, load and hot work are unforgiving. Toolbox talks, work permits, trained riggers and enforced PPE are non-negotiable — backed by 780 harnesses and 546 fall arrestors in our own stores.

First Time Right

Our founding principle. Alignment, plumbness and weld quality are measured and recorded, not estimated — instrumentation over judgement.

Full discipline list

Everything we execute

01Boiler Erection & Commissioning
02WHRS / WHRB Systems
03EPC & Turnkey Projects
04Industrial Piping — IBR & Non-IBR
05Structural Steel Fabrication & Erection
06Pressure Parts Erection
07Heavy Equipment Erection & Alignment
08Storage Tank Fabrication & Erection
09Industrial Fabrication Works
10Shutdown & Plant Maintenance
11Annual Maintenance & Plant O&M
12Insulation Works
13Blasting & Industrial Painting
14Technical Testing & Inspection
15Skilled Manpower Supply
16Construction Machinery Hiring